Back to Lawn SIT Home page

Notes from Lawn Avenue SIT meeting

  1. Address locker issue for backpacks
  2. Make sure white boards are magnetic.
  3. Replace the blinds on the windows.
  4. Research the sun exposure and heat build up on the south sides of the jr. high and 6th grade.
  5. Make sure the facilities committee has a written document with clear objectives to give to an architect/engineer.
  6. Lew Kitts mentioned that a mechanical survey was done at Lawn. It is in need of ventilation upgrades.
  7. Is there a way to secure spaces off at night to further utilize the building?
  8. Can the classroom in the library be moved to another space?
  9. Can the stage be given back and the keyboard classroom moved?
  10. Can different levels of lighting in the interior 5th grade classrooms be done?
  11. Can a sink be put in the teacherâs room?